Installation And Usage Instructions For GIS Main Busbar Enclosures

Oct 18, 2026 Leave a message

1. Inspection and Cleaning: Verify components against identification labels and drawings; inspect the enclosure, flange sealing surfaces, and bolt holes; remove any impurities from the inner walls and sealing surfaces.


2. Internal Assembly: Install the post insulators and conductive rods onto the positioning steps as specified in the drawings, ensuring the conductors are coaxial and the support is uniform.


3. Sealing and Fastening: Place O-rings into their designated grooves and apply vacuum-grade silicone grease; align the flanges, insert the bolts, and tighten them in a cross-pattern, applying torque in multiple stages to ensure even distribution.


4. Airtightness Verification: Fill the enclosure with SF₆ gas and perform a leak test; once verified, conduct withstand voltage and partial discharge tests, and record the relevant parameters.

Send Inquiry

Send Inquiry